One of the challenges of building out this system was that this was not here. |
Originally the design [of the parking deck] was for three fire alarm panels. But we elected to split it into quadrants and put in four panels. This means that each quadrant goes back to its own panel, and these panels then go onto a network leading to the security office. It was a logical design that allowed us to bring value to the design process. |
We had just 12 to 16 weeks to finish this project. |