If we anticipate it taking longer than 10 to 15 minutes we'll advance the trains to the east. Then we have to transport the crew by van [to the easterly location]. |
It has been determined that it was not speed-related. (The train) was traveling 46 mph in a 60 mph zone. |
Projected business volumes (on the line) do not support operating costs. This was a business decision. |
The crew was whistling before impact and put the train into an emergency brake application. Unfortunately the train was unable to stop (in time). |
The occupant of the vehicle was able to escape. There was minimal damage to the train and no injuries to the crew. |
There is no environmental threat. |
This week the BNSF will be meeting with representatives to further discuss the Port of Quincy issue. |
We are adjusting our operations to minimize the blockage at Birch Point. We'll try to minimize it to no more than 10 to 15 minutes. |
We're investing to meet present and future needs. |
With the heavy saturation, we have erosion and sloughing of the cliffs. The debris has no place to go but down. |