I've never been more excited about anything I've done on the authority. |
This is the first time that Canadian crude oil has been delivered to a Gulf Coast pipeline. |
We didn't have enough business for that line, so we shut it down at the end of 2002. |
We originally designed it to do 50,000 (barrels a day). We've managed to run the line rate higher than 66,000, so the future looks pretty bright for this right now. |