Contractors are not ecstatic about putting their labor hours and [other direct costs] into the EVM system. |
This is something that takes a lot of commitment and effort. It takes that much time to put the infrastructure in place and change the culture. |
This is the type of integration that takes a while, a lot of time and a lot of culture change. |